Part of United Eastern Group — serving the region since 1976+971 2 627 27 37  ·  info@uetmt.ae
Engineering & Maintenance

Capacitors in Distribution System

UETMT-ELEC-101 · Electrical

Programme Overview

  • General Background.
  • Power factor concept.
  • Reactive power regulating devices.
  • Generator exciter – capacitors – reactors – static VAR compensators.
  • Shunt capacitors and their location and size to reduce losses in distribution.

Representation of Individual Power System Components:

  • The Overhead Transmission Line.
  • Evaluation of Transmission Line Parameters.
  • Underground and Cables.
  • Shunt Elements.
  • Series Elements.
  • On load tap changing transformers.
  • Power factor improvement of resistance welders.
  • Power factor improvement of arc welding transformers.
  • Power factor improvement for induction furnaces.
  • Power Factor Test:
  • The meaning of reactive power and active power.
  • The meaning of compensation of reactive power, why is it necessary?
  • The difference between shunt compensation and series compensation.
  • The application of shunt capacitors and series capacitors.
  • Shunt capacitors and shunt reactors.
  • The optimum location and size used in power system.
  • At what voltage levels are the shunt capacitors installed.
  • Standard rating of capacitor units and capacitor banks.
  • The methods of voltage-control in power systems.
  • Economic of power capacitors.
  • Synchronous condenser and static shunt compensator.
  • Effect of reactive power flow on voltages

Harmonics and Source of Harmonics:

  • Diodes – Thyristors – Transformers.
  • Elimination of harmonics.
  • Filters, harmonic suppression.
  • Star – Delta transformers.
  • Problem caused by harmonics.
  • Individual compensation.
  • Power Factor Correction Calculation Example
  • Measurement of power factor.
  • The effect of shunt capacitors in distribution systems.
  • Computer Results for sample networks.
  • Selection of capacitor size and location to reduce distribution losses.
  • Selection of standard capacitor units and capacitor bank.
  • Rating of power capacitors.
  • Saving in electrical energy and economic aspects in using shunt capacitors.
  • Design of an Automatic Power factor Improvement Unit

Protective Relays and Protective Schemes:

  • Protective Schemes.
  • Low-voltage Protection.
  • Performance Check of Protective Relays and Measuring Equipment.
  • Capacitor Protection
  • Protection against Resonance.
  • Earthing and Bonding:
  • Disadvantages of Ungrounded Systems.
  • Types of Grounding.
  • Earthing Transformers, Current Transformers, and Voltage Transformers.
  • Safety Grounding
  • Seminar-Case Study-Discussion-Evaluation

Who Should Attend

All Engineers and technicians involved in the power sectors and power station operation and maintenance, and also in the factories, and enterprises, especially in distribution system.

Programme Objectives

  • The objectives of the program of Capacitors in Distribution System include the desire to acquaint electric power engineers and qualified technicians with Capacitors in Distribution System to correct power factor and its importance in distribution to reduce line losses and to attain certain voltage profile. The reactive power control is also the main desire of this short program as well as the voltage control. This includes a functional description of the distribution system, control, maintenance, and protection as well as the routine maintenance requirements of the distribution lines and underground cable. The program will include another objective for power factor improvement which is the minimization of losses or loss reduction distribution system.

Targeted Competencies

  • Capacitors in Distribution System
  • Overhead Transmission Line
  • Underground and Cables