Who Should Attend
- People who are making day to day decisions regarding operation, design, and economics of processing plants;
- 1st Line Operations personnel,
- Operation Supervisors,
- 1st Line Maintenance personnel,
- Senior Plant Supervisors,
- Operations Engineers
- Process Support Engineers,
- Design Engineers,
- Board men. Suitably qualified or experienced outside
- Operators may attend to enhance their process knowledge.
Ideal for veterans and those with years of experience who want to review or broaden their understanding in Processing Plant Operations.
- Other professionals who desire a better understanding of subject
Programme Objectives
Upon completion of this course, participant will be to gain:
- In-depth knowledge of the C5-C6 ISOMERIZATION Process and particularly the client’s unit
- A general understanding of the significance of the unit within the refinery scheme
- A broad technical understanding of the catalyst and the chemical reactions involved in the process
- A solid knowledge of the Process Flow Diagram and equipment
- A thorough knowledge of operating conditions and their impact on performance
- A good overview of the start-up and shutdown activities
- A sound knowledge of the main troubleshooting actions
Targeted Competencies
Programme Content
Day 1
- 1. Introduction
- Supply/demand situation
- Market trends
- Environmental regulation
- Focus on the unit in its Context
- 2. Process Objectives
- General information
- Feed characteristics
- Unit duty
- Products’ specifications
- Material Balance
Day 2
- 3. Process Description
- Process Flow Diagrams
- Piping & Instrumentation Diagrams
- Main equipment (Drawings, pictures and functions)
- 4. Dryers Mechanism and Regeneration
- Dryers objectives
- Adsorption theory
- Dryers regeneration
- Operating variables
Day 3
- Main Start up Activities
- Hydrogen pressurization
- Oil circulation, column start-up
- Drying out of the reaction section
- Acidizing and final drying
- Catalyst loading
- Pressurization
- First isomerization reactor line-up
- Second reactor line-up
- Lining-out at design capacity
- Normal Operation and Operating parameters
- Operating parameters
- Performance follow-up (yield, etc)
- Analysis
Day 4
- 9. Unit Shut-down/Restart
- Planned shut-down
- Restart
- 10. Emergency Shutdown
- Emergency shutdown
- Unscheduled shutdown
- Safety Interlocks
Day 5
- 11. Troubleshooting
- Typical causes and resolution of product quality incidents
- Operational disturbances
- 12. Catalyst Special Procedures
- Sulfur stripping
- Unloading