Part of United Eastern Group — serving the region since 1976+971 2 627 27 37  ·  info@uetmt.ae
Production Engineering

Beam Pump

UETMT-PRO-102 · Production Engineering

Programme Objectives

  • 1- Intermediate course is intended to improve the Technical Skills for Engineers in Production/Operations Engineering and for non-specialists who need an understanding of Production and Well Operations. The objective is to give an overview of the Production Operations Engineer’s responsibilities and of the deductive Process and Techniques that are required. Productivity and cost effectiveness will be taught together with some of the major considerations in programming and on-site supervision of well operations.
  • 2- The advanced course is intended for staff who are directly involved with Production Engineering and who have practical experience with the issues involved. The objective is to provide an in-depth discussion of various analysis and design techniques, reinforced by in-class exercises and examination of actual case histories. The course will also aim to introduce some topics which may be outside of the engineer’s current experience but which he may need later in his career.

Programme Content

DAY 1

General information about types of Beam Pumping Units:

  • Optional Equipment and Special Features
  • Pumping unit Operation and Maintenance.
  • Field Automation and Well Optimization.

DAY 2

  • Downhole Rod Pumps
  • Sucker Rods

Additional downhole Equipment:

  • a- Gas Separators
  • b- Tubing Anchoring
  • c- Pump off Controllers and Jack Shafts
  • d- Rod Scrapers and guides
  • e- Downhole Completion step by step

DAY 3

  • Distinction between Gas Locking, Gas Interference, and a Pumped off Condition
  • Gas Separation Designs and Devices.
  • Pumps and Accessories for Gas locking conditions, particulate & Scale Producing Conditions, High volume Production.

DAY 4

  • System Design:
  • a- Pump Capacity
  • b- Rod and beam Pump System Design
  • c- Estimation of Dynamic Effects
  • d- Effect of Surface equipment on the Pumping System
  • e- Rod Loading
  • f- Rod Fall Velocity
  • Computer Design Programs:
  • a-Beam Pump Data entry, what Type of data required to be in low is and how to upload and download from low is and SAM.
  • b-How to calculate the Production and card load .
  • c- Over view about S. Rod and how to run S. Rod.

DAY 5

  • Troubleshooting for Pump Installations.
  • How to find out there is a problem in Pump from low is &how to troubleshoot pump in location.
  • How to deal with SAM well manager &what to check in it.
  • Type of Dynograph & how to understand them(in low is & location).