Part of United Eastern Group — serving the region since 1976+971 2 627 27 37  ·  info@uetmt.ae
Drilling & Completions

Advanced Well Completion & Productivity

UETMT-DRG-4-110 · Drilling & Completions

Who Should Attend

  • Drilling Engineers
  • Drilling Supervisors
  • Senior Engineers
  • Team Leaders in Drilling Engineering/Operations

Programme Objectives

  • You will learn to reduce completion time and costs with the right design and obtain supply reduced later work over expense at the same time. You will find out how many stuck packers are not really stuck- How to improve productivity and reduce tubing costs. Discover haw to effectively complete for maximum artificial lift benefit.

Targeted Competencies

  • Well Completion Design and Equipment
  • Well Productivity
  • advanced well completions (AWC)
  • Stimulation and Artificial Lift Methods

Programme Content

  • Introduction to Completion Technology
  • Factors effects Completion Design
  • Well condition
  • Well depth
  • Formation type
  • Production interval
  • Completion Principles
  • Well hydraulics
  • Tubing stretch selections -Gas Velocity
  • Partial pressure
  • Basic Completion equipment
  • Packers
  • Permanent packers
  • Retrievable packers (Hydraulic- Hydrostatic ­Mechanical)
  • Flow control equipment
  • Safety valves
  • Completion accessories (expansion joint flow coupling – blast joint)
  • Packer and tubing effect
  • Packer design and goals
  • Hydraulics of Packers
  • Tubular Elongation ad shortening Temperature
  • Ballooning
  • Helical Buckling
  • Type of completion:
  • Single /single selective.
  • Dual
  • Lateral
  • Monobore
  • Gravel pack
  • How to design & set up a completion
  • Tubing movement calculations and analysis
  • Metal Selection
  • Elastorner Selection