Part of United Eastern Group — serving the region since 1976+971 2 627 27 37  ·  info@uetmt.ae
Drilling & Completions

Cementing Technology

UETMT-DRG-3-115 · Drilling & Completions

Programme Overview

Cementing Operations are critical for well life as they constitute the foundations of any gas or oil well. Well Integrity is compromised, unless efficient cementing operations are carried out in every casing job. Like the foundations of a house, Cementing is the basis for an efficient well performance.

Who Should Attend

  • Drilling Engineers, Drilling Supervisors with working experience in Drilling Engineering Operations

Programme Objectives

  • Well Cementing is the process of bonding the pipe to the formation on other operation in drilling or completion process plays as important a role in the producing life of the well as does a successful primary cement job.

Targeted Competencies

  • Primary Cementing Operations
  • Cement Placement
  • Cement Calculations
  • Cement Additives and Mud Removal
  • Special Cement Systems

Programme Content

  • Functions of Cementing
  • Cementing
  • Cementing Equipment
  • Setting up a Cementing Job
  • Preplanning
  • Bulk handling and stage
  • Properties of slurries required for cementing Hole /slurry considerations
  • Strength of Cements to support pipe
  • Mixing water
  • Slurry density
  • Cement additions
  • Cement accelerations
  • Cement retarders
  • Last circulation additives
  • Special additives for cement
  • Casing Equipment
  • Considerations during Cement
  • Placements Techniques
  • Considerations after Cement
  • Special Cement situations
  • Continued special Cement situations
  • Plugging
  • Types of Cement plugs
  • Placement Techniques
  • Testing Cement plugs
  • Squeeze Cementing
  • Squeeze techniques
  • Job Planning
  • Squeeze Packers
  • Water Control
  • Identify the problem
  • Design Treatments for Problems
  • Infectivity patterns
  • Cementing Horizontal deviated Well bores