Part of United Eastern Group — serving the region since 1976+971 2 627 27 37  ·  info@uetmt.ae
Drilling & Completions

Safety Practices in Wireline

UETMT-DRG-2-126 · Drilling & Completions

Programme Overview

The program is designed to address all HSE Issues associated with Wirelines operations starting from call for Wireline operation till end of this operations including but not limited to W/L Tools & Equipment, Gas Wells and H2S and BOP.

Who Should Attend

  • Drilling Engineers
  • Drilling Supervisors
  • Team Leaders in Drilling Engineering/Operations

Programme Objectives

By the end of the program, participants will be able to:

  • Improve understanding and awareness of equipment operation and correct procedures.
  • Improve efficiency and to reduce downtime from insufficient maintenance and / or preparation of equipment.
  • Increase individual’s knowledge and confidence.
  • Improve on / site safety.
  • Aid personnel involved in purchase and inventory control of wire line tools and equipment.

Targeted Competencies

  • Operation in Heavy Fluids and Drags
  • Wireline Equipment Routine Checks
  • Safe Working Procedures and Practices

Programme Content

General Safety Regulations:

  • Personnel Safety
  • Safe Procedures
  • Arrival to Camp Location
  • Information Necessary from Supervisor
  • Driving in Desert

Safe Working Procedures and Practices:

  • House Keeping
  • Hand Tools & PPE

Operation in Heavy Fluids & Drags:

  • Wire line Operations in Mud or Heavy Fluid
  • Gas Wells and H2S
  • Cranes and Lifting Tackle
  • Ladders, Scaffolding and Staging
  • Purchase and Inventory Control of W/L Tools and Equipment
  • How to select the Wire line size and how to keep the Tools

Wireline Equipment Routine Checks:

  • Wire line Surface Equipment
  • Stuffing Box
  • Blow Out Preventer B.O.P
  • Location Wire line Operational Safety
  • Care & Maintenance of Wire line