Part of United Eastern Group — serving the region since 1976+971 2 627 27 37  ·  info@uetmt.ae
Drilling & Completions

Sand Control

UETMT-DRG-2-112 · Drilling & Completions

Programme Overview

Sand causes a wide variety of costly problems when Oil and Gas are produced from unconsolidated Reservoirs. The most costly problem is usually the loss of Production resulting from Formation Damage caused by poorly planned and/or executed Sand Control Applications.

The program will also teach how to perform Quality Control checks during the Sand Control application to help insure successful wells. Several new sand control technologies have been introduced in the last few years. The proper application of these technologies will be thoroughly covered. Participants will gain a thorough understanding of what is necessary to design and implement cost effective Sand Control in Producing Wells.

Who Should Attend

Drilling, Completion, Production and Research Engineers; field Supervisors and Production foremen; Technical Personnel who supply services and equipment

Programme Objectives

  • By the end of the program, participant will be able to
  • Determine the Causes of Sand Production
  • Determine the need for Sand Control
  • Select the best Sand Control method
  • Prepare the Well for gravel packs
  • Prepack perforations and determine when prepacking is appropriate
  • Apply “Best Practices” to ensure successful Sand Control Completions
  • Conduct successful "frac packs"
  • Evaluate Sand Control Performance
  • Minimize Production Losses
  • Evaluate new Technologies for proper applications

Targeted Competencies

  • Sand Control

Programme Content

Day 1

  • Sand control techniques
  • Radial flow and formation damage
  • Causes and effects of sand production

Day 2

  • Predicting sand production
  • Gravel pack design
  • Slotted liners and wire wrapped screens

Day 3

  • Gravel pack completion equipment and service tools
  • Well preparation for gravel packing
  • Perforating for gravel placement techniques

Day 4

  • Perforation prepacking and enhanced prepacking
  • Frac packing
  • Open hole gravel packing

Day 5

  • Expandable screens
  • Gravel pack performance
  • Horizontal well completions